Operation Preparedness Completed for BJL14 East

For timely opening of BJL14 East on December 28, BJMTR has completed operation preparedness for stations from Shangezhuang station to Jintai station. It is forecasted that the average daily patronage of BJL14 East will reach 193K at the initial stage of the trial operation.   BJMTR planned 260 train trips a day at this section. The minimum headway is 8 minutes and the travel time is 26 minutes.