On this day, the operation of the south section of Line 17 is organized according to the weekday timetable. 298 train trips are provided, with a minimum headway of 6 minutes in peak hours and headway of 8 minutes during off-peak hours. A total of 25,000 passengers are transported throughout the day.
Line 14 is realizes full-line operation on the opening day of the remaining section. The operation of Line 14 is organized according to the weekday timetable. 522 train trips are provided with a minimum headway of 3 minutes in peak hours and headway of 6 minutes during off-peak hours. A total of 831,000 passengers are transported throughout the day.
The operation of Line 16 is organized according to the weekday timetable. 278 train trips are provided throughout the day, with a minimum headway of 6 minutes and headway of 8 minutes during off-peak hours. A total of 181,000 passengers were transported throughout the day and the operation is stable and smooth in general.