Preparation for the change of fare system is in progress. Upgrading of the AFC system at BJMTR operating lines (BJL4, DXL and BJL14) completed. Tests on interlink of the existing lines are in progress, tests between new lines and tests between existing lines and new lines will follow. Time needed for the tests is estimated at about 100 hours.
Movable Ticket Book Booth Added at Beijing South Railway Station BJL4
2014-12-10
BigMediumSmall